Service timetable
12:30 Liverpool Biomass Terminal Gbf to Drax Aes (GB Railfreight)
Saturday 21 November 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2400
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Liverpool Biomass Terminal Gbf | 12:30 | |||||
| Strand Road Level Crossing | 12:40 | 12:42 | ||||
| Tuebrook Sidings GB Railfreight | 13:10 | 13:34 | ||||
| Warrington Bank Quay | UG | 14:09½ | 14:28 | |||
| Ashton Moss North Junction | 16:01½ | 16:15½ | ||||
| Healey Mills S.s. | 17:42½ | 17:58 | ||||
| Wakefield Kirkgate | 3 | 18:15 | 18:17 | |||
| Drax Aes (GB Railfreight) | 19:03 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.