Detailed timetable

09:59 Kennett (Fhh) to Barrow Hill Up Sidings No 2-3

Saturday 21 November 2026

Live map
Headcode: 6M40Headcode6M40 UIDH55492

Planned service information

Power type
Diesel
Timing load / planned train type
600
Maximum speed
60 mph
Operating characteristics
Q
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Kennett (Fhh)09:59
Kennet Redland Ground Frmepass10:04
Bury St Edmunds Dgl10:1611:02
Bury St Edmunds211:0511:08
Kennettpass11:20
Chippenham Junctionpass11:24
Sohampass11:31½
Ely Dock Junctionpass11:38½
ElyUGL11:40½11:58
Ely North Junctionpass12:02
Third Drove Signal Ca923pass12:08½
Manea Signal M43pass12:10
Maneapass12:11½
Stoneapass12:13½
March South Signal Ms933pass12:15½
March1pass12:19
March West Junctionpass12:19½
Three Horse Shoespass12:26
Eastrea Signal Ths27pass12:28
Whittleseapass12:29½
Kings Dykepass12:31½
Peterborough East Junctionpass12:36
Peterborough712:38½12:42½
Marholm Junctionpass12:46½
Helpston Junctionpass12:50
Uffington Sb (Lincs)pass12:54½
Ketton S.b.pass13:01
Luffenhampass13:04
Manton Junctionpass13:08½
Oakhampass13:14
Langham Junction13:1914:00½
Ashwell L.c.pass14:03
Whissendine L.c.pass14:06
Melton Mowbraypass14:12½
Frisbypass14:18
Syston East Junctionpass14:27½
Syston North Junctionpass14:29
Sileby Junctionpass14:32½
Loughborough (Leics)3pass14:38½
Ratcliffe Junctionpass14:49½
Trent South Junctionpass14:51½
Meadow Lane Junctionpass14:54
Toton South Junctionpass14:55½
Toton Centre Junction14:58½15:03
Trowell Junctionpass15:09
Langley Mill1pass15:14
Ironville Junctionpass15:17½
Alfretonpass15:21
Clay Cross North Junctionpass15:29
Chesterfield South Junctionpass15:31½
Chesterfield3pass15:32½
Tapton Junctionpass15:33½
Barrow Hill South Junctionpass15:38½
Barrow Hill Up Sidings No 2-315:42

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.