Detailed timetable
00:04 Cambridge North to Cambridge Sidings South
Saturday 21 November 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 720
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Cambridge North | 2 | 00:04 | 23:59 | -5 min | ||
| Coldham Lane Junction | pass | 00:06½ | 00:02 | -4 min | ||
| Mill Road Junction | pass | 00:09 | 00:19 | +10 min | ||
| Cambridge Sidings South | 00:15 | 00:25 | +10 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.