Service timetable
06:12 Skipton Down Stabling Siding to Ribblehead
Saturday 21 November 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- S
- Maximum speed
- 75 mph
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Skipton Down Stabling Siding | 06:12 | 06:09 | -3 min | |||
| Skipton | 4 | 06:14 | 06:21 | 06:09 | 06:21 | On time |
| Ribblehead | 2 | 06:52 | 06:52 | 06:50 | 06:50 | -2 min |
| Blea Moor U.g.l. | 06:56 | 07:00 | No report | |||
| Ribblehead | 07:04 | 07:04 | On time | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.