Service timetable
07:26 Ashford Down Sidings to Margate
Saturday 21 November 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 395
- Maximum speed
- 140 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Ashford Down Sidings | 07:26 | No report | ||||
| Ashford Down Yard Washer Rd | 07:41 | 07:41 | No report | |||
| Ashford Dn Yard Cntb End | 07:44 | 07:44 | No report | |||
| Ramsgate | 3 | 08:16 | 08:25 | 08:23 | 08:24 | -1 min |
| Margate | 3 | 08:35 | 08:34 | -1 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.