Detailed timetable
13:47 Arbroath to Arbroath
Saturday 21 November 2026
Planned service information
- Power type
- Diesel multiple unit
- Timing load / planned train type
- E
- Maximum speed
- 90 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Arbroath | 2 | 13:47 | ||||
| Arbroath Up North Siding | 13:49 | 14:06½ | ||||
| Arbroath | 1 | 14:08 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.