Service timetable

11:35 Liverpool Biomass Terminal Gbf to Drax Aes (GB Railfreight)

Sunday 22 November 2026

Live map
Headcode: 6E10Headcode6E10 UIDH51282

Planned service information

Power type
Diesel
Timing load / planned train type
2400
Maximum speed
60 mph
Operating characteristics
Y
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Liverpool Biomass Terminal Gbf11:35
Strand Road Level Crossing11:4511:47
Tuebrook Sidings GB Railfreight12:1512:38
Hartford Junction13:31½13:32½
Ashton Moss North Junction14:47½15:20
Wakefield Kirkgate316:59½17:04
Drax Aes (GB Railfreight)17:47

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.