Service timetable
10:30 Drax Aes (GB Railfreight) to Liverpool Biomass Terminal Gbf
Sunday 22 November 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 800
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Drax Aes (GB Railfreight) | 10:30 | |||||
| Wakefield Kirkgate | 3 | 11:10 | 11:13 | |||
| Ordsall Lane Junction | 12:34 | 12:37½ | ||||
| Edge Lane Junction | 13:21 | 13:31 | ||||
| Bootle Junction Stop Board | 13:47½ | 13:49½ | ||||
| Strand Road Level Crossing | 13:54 | 13:56 | ||||
| Liverpool Biomass Terminal Gbf | 14:06 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.