Service timetable
11:57 Doncaster Down Decoy GB Railfreight to Liverpool Biomass Terminal Gbf
Sunday 22 November 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 800
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Doncaster Down Decoy GB Railfreight | 11:57 | 11:55 | -2 min | |||
| Wakefield Kirkgate | 12:29 | 12:40½ | 12:41 | 12:43 | +3 min | |
| Heaton Norris Junction | 14:03½ | 14:04½ | 14:13 | 14:14½ | +10 min | |
| Edge Lane Junction | 15:37 | 15:51 | 16:07 | 16:07 | +16 min | |
| Bootle Junction Stop Board | 16:07½ | 16:09½ | No report | |||
| Strand Road Level Crossing | 16:14 | 16:16 | No report | |||
| Liverpool Biomass Terminal Gbf | 16:26 | 16:40 | +14 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.