Detailed timetable
06:51 Ashford Down Sidings to Robertsbridge
Sunday 22 November 2026
Planned service information
- Power type
- Electric multiple unit
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Ashford Down Sidings | 06:51 | No report | ||||
| Ashford Down Yard Washer Rd | 07:02 | 07:09 | No report | |||
| Ashford Down Yard | 07:12 | 07:12 | No report | |||
| Ashford International | 5 | 07:18 | 07:18 | 07:16 | 07:18 | On time |
| Headcorn | UM | pass | 07:28 | 07:26 | -2 min | |
| Paddock Wood | UM | pass | 07:35 | 07:37 | +2 min | |
| Tonbridge | 1 | 07:41 | 07:53 | 07:43 | 07:51 | -2 min |
| Somerhill Tunnel | pass | 07:55 | 07:53 | -2 min | ||
| Wells Tunnel Junction | pass | 07:59½ | No report | |||
| Tunbridge Wells | 2 | 08:01 | 08:10 | 08:00 | 08:00 | -10 min |
| Strawberry Hill Tunnel | pass | 08:12 | No report | |||
| Wadhurst | pass | 08:17½ | 08:06 | -11 min | ||
| Wadhurst Tunnel South | pass | 08:19 | No report | |||
| Robertsbridge | 08:30 | 08:19 | -11 min | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.