Detailed timetable
07:44 Ashford Down Sidings to Robertsbridge
Sunday 22 November 2026
Planned service information
- Power type
- Electric multiple unit
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Ashford Down Sidings | 07:44 | No report | ||||
| Ashford Down Yard Washer Rd | 07:55 | 08:02 | No report | |||
| Ashford Down Yard | 08:05 | 08:05 | No report | |||
| Ashford International | 6 | 08:07 | 08:07 | 08:08 | 08:11 | +4 min |
| Headcorn | UM | pass | 08:16 | 08:22 | +6 min | |
| Paddock Wood | UM | pass | 08:24 | 08:31 | +7 min | |
| Tonbridge | 1 | 08:35 | 08:42 | 08:37 | 08:40 | -2 min |
| Somerhill Tunnel | pass | 08:44 | 08:42 | -2 min | ||
| Wells Tunnel Junction | pass | 08:50½ | No report | |||
| Tunbridge Wells | 2 | 08:52 | 08:59 | 08:52 | 08:58 | -1 min |
| Strawberry Hill Tunnel | pass | 09:01 | No report | |||
| Wadhurst | pass | 09:06½ | 09:05 | -1 min | ||
| Wadhurst Tunnel South | pass | 09:08 | No report | |||
| Robertsbridge | 09:19 | 09:19 | On time | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.