Detailed timetable

04:44 Three Bridges to Three Bridges

Monday 23 November 2026

Live map
Headcode: 5R04Headcode5R04 OperatorThameslink UIDC20285

Planned service information

Power type
Electric multiple unit
Timing load / planned train type
700
Maximum speed
100 mph
Operating characteristics
D
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Three Bridges304:44 04:41 -3 min
Balcombe Tunnel Junctionpass04:47 04:44 -3 min
Copyhold Junctionpass04:51½ 04:48 -3 min
Haywards Heath404:5305:08 04:50 05:08 On time
Copyhold Junctionpass05:09½ No report
Balcombe Tunnel Junctionpass05:14 05:45 +31 min
Three Bridges205:17 05:49 +32 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.