Detailed timetable
06:41 3Bdgs Down Thameslink Sidings to Haywards Heath
Monday 23 November 2026
Planned service information
- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operating characteristics
- D
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| 3Bdgs Down Thameslink Sidings | 06:41 | No report | ||||
| 3 Bridges Dn Dep Sig Td127 | 06:46 | 06:47 | No report | |||
| Balcombe Tunnel Junction | pass | 06:49½ | 06:48 | -1 min | ||
| Copyhold Junction | pass | 06:54½ | No report | |||
| Haywards Heath | 4 | 06:56 | 06:59 | +3 min | ||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.