Service timetable
12:19 Tyne Coal Terminal GB Railfreight to Drax Aes (GB Railfreight)
Monday 23 November 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 1800
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Tyne Coal Terminal GB Railfreight | 12:19 | 12:19 | On time | |||
| Boldon North Junction | 12:30 | 12:32 | 12:30 | 12:38 | +6 min | |
| Skelton Bridge Junction | 14:42½ | 14:46 | 14:36½ | 14:46 | On time | |
| Church Fenton | 1 | 15:06½ | 15:13½ | 15:06½ | 15:13½ | |
| Drax Aes (GB Railfreight) | 15:53 | 15:53 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.