Service timetable
01:34 Tyne Coal Terminal GB Railfreight to Drax Aes (GB Railfreight)
Monday 23 November 2026
Planned service information
- Power type
- Diesel
- Timing load / planned train type
- 2000
- Maximum speed
- 60 mph
- Operating characteristics
- Y
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Tyne Coal Terminal GB Railfreight | 01:34 | 01:34 | On time | |||
| York | 3 | 04:04½ | 04:15 | 04:04½ | 04:15 | |
| Drax Aes (GB Railfreight) | 05:19 | 05:19 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.