Detailed timetable

05:40 Barry Tourist Railway to Cardiff Central

Monday 23 November 2026

Live map
Headcode: 5K04Headcode5K04 OperatorTransport for Wales UIDY62436

Planned service information

Power type
Diesel multiple unit
Timing load / planned train type
S
Maximum speed
75 mph
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Barry Tourist Railway05:40 No report
Barry Down Siding05:5506:00 05:58 -2 min
Cadoxtonpass06:07 06:05 -2 min
Cogan Junctionpass06:15 06:16 +1 min
Penarth Curve South Junctionpass06:20 No report
Cardiff Central606:24 06:25 +1 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.