Service timetable

10:57 Hornsey E.m.u.d. to Three Bridges Tl Up Depot 3T43

Tuesday 24 November 2026Thameslink

Service details

Power type
Electric multiple unit
Timing load / planned train type
700
Maximum speed
100 mph
Operation
Driver-only operation; Runs as required
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Hornsey E.m.u.d.10:57
Farringdon (London)311:1211:13
London Blackfriars111:15½11:16½
Three Bridges311:5712:03
Three Bridges Up Tld Nx12:0512:05
Three Bridges Tl Up Depot12:09

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.