- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operation
- Driver-only operation
Detailed timetable
11:04 Three Bridges to Three Bridges Tl Up Depot 5T89
Tuesday 24 November 2026Thameslink
Service details
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Three Bridges | 3 | 11:04 | ||||
| Three Bridges Up Tld Nx | 11:06 | 11:06 | ||||
| Three Bridges Tl Up Depot | 11:10 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.