Detailed timetable

08:17 London Waterloo to Northam C.s.d. 5B81

Tuesday 24 November 2026South Western Railway

Service details

Allocation updated 02:08
Allocated units 450099 + 450011 + 450084
Power type
Electric multiple unit
Class
450
Fleet
450/0
Formation
12 cars
Length
244.2 m
Maximum speed
100 mph
Operation
Driver-only operation
Show individual vehicle numbers
Units 1
  1. 63699 EA3170B
  2. 68199 EH2000N
  3. 64299 ES2640A
  4. 63299 EA3170A
Units 2
  1. 63611 EA3170B
  2. 68111 EH2000N
  3. 64211 ES2640A
  4. 63211 EA3170A
Units 3
  1. 63684 EA3170B
  2. 68184 EH2000N
  3. 64284 ES2640A
  4. 63284 EA3170A
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
London Waterloo908:17 08:26 +9 min
Waterloo West Crossingspass08:18½ No report
Clapham Junction9pass08:23 08:32 +9 min
Wimbledon7pass08:27 08:35 +8 min
New Maldenpass08:29 08:38 +9 min
Surbiton3pass08:33½ 08:40 +7 min
Hampton Court Junctionpass08:35½ 08:41 +6 min
Weybridge3pass08:45½ No report
Byfleet & New Hawpass08:46½ 08:46 On time
Woking408:5108:52 08:54 08:55 +3 min
Woking Junctionpass08:53 08:55 +2 min
Farnborough (Main)pass08:59½ 09:02 +3 min
Basingstoke1pass09:15 09:14 -1 min
Worting Junction09:1809:22 09:17 09:19 -3 min
Micheldeverpass09:28½ No report
Wallers Ash Looppass09:30½ 09:31 +1 min
Winchester2pass09:37 09:38 +1 min
Shawford Down Junctionpass09:38½ 09:40 +2 min
Allbrookpass09:41 No report
EastleighDFpass09:41½ 09:44 +3 min
Southampton Airport Parkway2pass09:45½ 09:44 -1 min
St Denyspass09:50 09:54 +4 min
Northam Depot Recept Linepass09:53 10:06 +13 min
Northam C.s.d.10:08 10:21 +13 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.

Rolling-stock information is the latest allocation reported by Network Rail. Allocations can change, and updates may be delayed during disruption.