Service timetable

18:40 Barrow-in-Furness to Barrow-in-Furness 5C43

Tuesday 24 November 2026Northern

Service details

Allocation updated 01:18
Allocated unit 156475
Power type
Diesel multiple unit
Class
156
Fleet
156/0
Formation
2 cars
Length
46.1 m
Maximum speed
75 mph
Orientation
Reversed
Show individual vehicle numbers
Unit 1
  1. 57475 DP2450A
  2. 52475 DP2440A
Allocated unit 156475
Power type
Diesel multiple unit
Class
156
Fleet
156/0
Formation
2 cars
Length
46.1 m
Maximum speed
75 mph
Show individual vehicle numbers
Unit 1
  1. 52475 DP2440A
  2. 57475 DP2450A
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Barrow-in-Furness118:40 18:40 On time
Barrow-N-Frns Sig 52/53/5418:4218:46 18:42 18:46
Barrow-in-Furness318:48 18:48

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.

Rolling-stock information is the latest allocation reported by Network Rail. Allocations can change, and updates may be delayed during disruption.