- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operation
- Driver-only operation
Detailed timetable
06:27 Bedford to Bedford North Sidings 5W14
Wednesday 25 November 2026Thameslink
Cancelled This service has been reported as cancelled.
Service details
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Bedford | 1 | 06:27 | ||||
| Bedford North Sidings | 06:29 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.