- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operation
- Driver-only operation; Runs as required
Service timetable
04:20 Hornsey E.m.u.d. to Three Bridges Tl Up Depot 3W47
Wednesday 25 November 2026Thameslink
Service details
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Hornsey E.m.u.d. | 04:20 | |||||
| Holloway South Sig K326 | 04:26 | 04:30 | ||||
| Farringdon (London) | 3 | 04:38 | 04:39 | |||
| Selhurst | 1 | 05:14½ | 05:17 | |||
| Gatwick Airport | 3 | 05:42 | 05:43½ | |||
| Three Bridges | 3 | 05:48 | 05:50 | |||
| Three Bridges Up Tld Nx | 05:52 | 05:52 | ||||
| Three Bridges Tl Up Depot | 05:56 | |||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.