- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Seating
- First and Standard class
- Reservations
- Reservations possible from any station
- Operation
- Driver-only operation
Service timetable
03:23 Peterborough to London Kings Cross 1P79
Wednesday 25 November 2026Thameslink
Service details
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Peterborough | 1 | 03:23 | 03:23 | On time | ||
| Huntingdon | 2 | 03:37 | 03:38 | 03:36½ | 03:38 | |
| St Neots | 4 | 03:45 | 03:45 | 03:45 | 03:45½ | |
| Sandy | 1 | 03:53 | 03:53 | 03:52½ | 03:53 | |
| Biggleswade | 1 | 03:57 | 03:57 | 03:56½ | 03:57½ | |
| Arlesey | 04:02 | 04:02 | 04:02 | 04:02½ | ||
| Hitchin | 1 | 04:11 | 04:11 | 04:10½ | 04:11½ | |
| Stevenage | 1 | 04:16 | 04:17 | 04:16 | 04:17 | |
| Finsbury Park | 2 | 04:44 | 04:45 | 04:43½ | 04:45½ | |
| London Kings Cross | 4 | 04:51 | 04:51 | |||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.