Detailed timetable

13:09 London Waterloo to Portsmouth Harbour 1T37

Wednesday 25 November 2026South Western Railway

Service details

Allocation updated 01:39
Allocated units 450001 + 450106
Power type
Electric multiple unit
Class
450
Fleet
450/0
Formation
8 cars
Length
162.8 m
Maximum speed
100 mph
Seating
First and Standard class
Reservations
Reservations possible from any station
Show individual vehicle numbers
Units 1
  1. 63601 EA3170B
  2. 68101 EH2000N
  3. 64201 ES2640A
  4. 63201 EA3170A
Units 2
  1. 63706 EA3170B
  2. 66856 EH2000N
  3. 66806 ES2640A
  4. 63756 EA3170A
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
London Waterloo1613:09 13:09 On time
Waterloo West Crossingspass13:10½ No report
Clapham Junction9pass13:15 13:15 On time
Wimbledon7pass13:19 13:20 +1 min
New Maldenpass13:21 13:23 +2 min
SurbitonDFpass13:23 13:24 +1 min
Hampton Court Junctionpass13:24 13:25 +1 min
Woking413:3313:34 13:34 13:35 +1 min
Woking Junctionpass13:35 13:36 +1 min
Farnborough London Endpass13:43 No report
Farnborough (Main)213:4413:44 13:44 13:45 +1 min
Fleet13:4913:50 13:49 13:50 On time
Basingstoke214:0214:03 14:03 14:04 +1 min
Worting Junctionpass14:06 14:07 +1 min
Micheldever14:1314:13 No report
Wallers Ash Looppass14:16 14:17 +1 min
Winchester214:2114:22 14:21 14:22 On time
Shawford Down Junctionpass14:24½ 14:25 +1 min
Allbrookpass14:27½ No report
Eastleigh314:3014:31 14:30 14:31 On time
Eastleigh South Junctionpass14:33 No report
Hedge End14:3714:37 No report
Botley14:4114:41 14:42 14:43 +2 min
Fareham North Junctionpass14:47 No report
Fareham314:4914:49 14:50 14:51 +2 min
Portchester14:5514:55 14:56 14:57 +2 min
Cosham14:5915:00 15:00 15:01 +1 min
Cosham Junctionpass15:01½ 15:03 +2 min
Portcreek Junctionpass15:02½ 15:04 +2 min
Hilsea15:0415:04 15:05 15:06 +2 min
Fratton Eastpass15:07 15:09 +2 min
Fratton315:0815:09 15:10 15:11 +2 min
Portsmouth & Southsea215:1215:13 15:14 15:15 +2 min
Portsmouth Harbour415:18 15:19 +1 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.

Rolling-stock information is the latest allocation reported by Network Rail. Allocations can change, and updates may be delayed during disruption.