Detailed timetable

16:09 London Waterloo to Portsmouth Harbour 1T49

Thursday 26 November 2026South Western Railway

Service details

Allocation updated 01:34
Allocated units 450110 + 450072
Power type
Electric multiple unit
Class
450
Fleet
450/0
Formation
8 cars
Length
162.8 m
Maximum speed
100 mph
Seating
First and Standard class
Reservations
Reservations possible from any station
Show individual vehicle numbers
Units 1
  1. 63710 EA3170B
  2. 66860 EH2000N
  3. 66810 ES2640A
  4. 63760 EA3170A
Units 2
  1. 63672 EA3170B
  2. 68172 EH2000N
  3. 64272 ES2640A
  4. 63272 EA3170A
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
London Waterloo1316:09 16:09 On time
Waterloo West Crossingspass16:10½ No report
Clapham Junction9pass16:15 16:15 On time
Wimbledon7pass16:19 16:18 -1 min
New Maldenpass16:21 16:20 -1 min
SurbitonDFpass16:23 16:22 -1 min
Hampton Court Junctionpass16:24 16:23 -1 min
Woking416:3316:34 16:32 16:34 On time
Woking Junctionpass16:35 16:35 On time
Farnborough London Endpass16:43 No report
Farnborough (Main)216:4416:44 16:43 16:44 On time
Fleet16:4916:50 16:49 16:50 On time
Basingstoke217:0217:03 17:01 17:03 On time
Worting Junctionpass17:06 17:06 On time
Micheldever17:1317:13 No report
Wallers Ash Looppass17:16 17:15 -1 min
Winchester217:2117:22 17:20 17:22 On time
Shawford Down Junctionpass17:24½ 17:24 On time
Allbrookpass17:27½ No report
Eastleigh317:3017:31 17:30 17:31 On time
Eastleigh South Junctionpass17:33 No report
Hedge End17:3717:37 No report
Botley17:4117:41 17:42 17:43 +2 min
Fareham North Junctionpass17:47 No report
Fareham317:4917:49 17:53 17:54 +5 min
Portchester17:5517:55 17:59 18:00 +5 min
Cosham17:5918:00 18:04 18:05 +5 min
Cosham Junctionpass18:01½ 18:06 +5 min
Portcreek Junctionpass18:02½ 18:07 +5 min
Hilsea18:0418:04 18:09 18:10 +6 min
Fratton Eastpass18:07 18:12 +5 min
Fratton318:0818:09 18:13 18:15 +6 min
Portsmouth & Southsea218:1218:13 18:18 18:19 +6 min
Portsmouth Harbour318:20 18:23 +5 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.

Rolling-stock information is the latest allocation reported by Network Rail. Allocations can change, and updates may be delayed during disruption.