Detailed timetable

00:19 Lewisham to Grove Park Up C.h.s. 5Y91

Thursday 26 November 2026Southeastern

Service details

Allocation updated 23:14
Allocated units 376028 + 376036
Power type
Electric multiple unit
Class
376
Fleet
376/0
Formation
10 cars
Length
201.6 m
Maximum speed
75 mph
Operation
Driver-only operation
Show individual vehicle numbers
Units 1
  1. 61128 EA2920A
  2. 63328 EC2430A
  3. 64328 EK2010A
  4. 63528 EC2430B
  5. 61628 EA2920B
Units 2
  1. 61136 EA2920A
  2. 63336 EC2430A
  3. 64336 EK2010A
  4. 63536 EC2430B
  5. 61636 EA2920B
Allocated units 376036 + 376028
Power type
Electric multiple unit
Class
376
Fleet
376/0
Formation
10 cars
Length
201.6 m
Maximum speed
75 mph
Operation
Driver-only operation
Show individual vehicle numbers
Units 1
  1. 61136 EA2920A
  2. 63336 EC2430A
  3. 64336 EK2010A
  4. 63536 EC2430B
  5. 61636 EA2920B
Units 2
  1. 61128 EA2920A
  2. 63328 EC2430A
  3. 64328 EK2010A
  4. 63528 EC2430B
  5. 61628 EA2920B
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Lewisham100:19 00:19 On time
Lewisham Vale Junctionpass00:20 00:20 On time
Tanners Hill Junction (Nx)pass00:21 00:21 On time
New Crosspass00:22 00:22 On time
Blue Anchor (Kent)pass00:24 00:24 On time
London Bridge800:2700:36 00:27 00:34 -2 min
Blue Anchor (Kent)pass00:38 00:37 -1 min
New Crosspass00:40½ 00:39 -1 min
Tanners Hill Junction (Nx)pass00:41½ 00:40 -1 min
Parks Bridge Junctionpass00:42½ 00:41 -1 min
Hither Green2pass00:44 00:43 -1 min
Grove Park Up Sg Ln Ed Extpass00:46 00:45
Grove Park Up C.h.s.00:54 00:53 -1 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.

Rolling-stock information is the latest allocation reported by Network Rail. Allocations can change, and updates may be delayed during disruption.