Detailed timetable

04:06 Selhurst Depot Field Sidings to Purley 5T91

Friday 27 November 2026Southern

Service details

Allocation updated 04:09
Allocated units 377621 + 377707
Power type
Electric multiple unit
Class
377
Fleets
377/6 + 377/7
Formation
10 cars
Length
201.6 m
Maximum speed
100 mph
Operation
Driver-only operation
Show individual vehicle numbers
Units 1
  1. 70121 EM3060A
  2. 70221 EC2700A
  3. 70321 EK2600A
  4. 70421 EC2710A
  5. 70521 EM2110A
Units 2
  1. 65207 EM3070A
  2. 70607 EC2800A
  3. 65607 EK2700A
  4. 70707 EC2810A
  5. 65407 EM2210A
Allocated units 377707 + 377621
Power type
Electric multiple unit
Class
377
Fleets
377/7 + 377/6
Formation
10 cars
Length
201.6 m
Maximum speed
100 mph
Operation
Driver-only operation
Orientation
Reversed
Show individual vehicle numbers
Units 1
  1. 65407 EM2210A
  2. 70707 EC2810A
  3. 65607 EK2700A
  4. 70607 EC2800A
  5. 65207 EM3070A
Units 2
  1. 70521 EM2110A
  2. 70421 EC2710A
  3. 70321 EK2600A
  4. 70221 EC2700A
  5. 70121 EM3060A
Allocated units 377621 + 377707
Power type
Electric multiple unit
Class
377
Fleets
377/6 + 377/7
Formation
10 cars
Length
201.6 m
Maximum speed
100 mph
Operation
Driver-only operation
Show individual vehicle numbers
Units 1
  1. 70121 EM3060A
  2. 70221 EC2700A
  3. 70321 EK2600A
  4. 70421 EC2710A
  5. 70521 EM2110A
Units 2
  1. 65207 EM3070A
  2. 70607 EC2800A
  3. 65607 EK2700A
  4. 70707 EC2810A
  5. 65407 EM2210A
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Selhurst Depot Field SidingsS304:06 No report
Selhurst Dpt Tennison Roadpass04:11 No report
Selhurst Depot Yard RoadsYD104:12½04:18½ No report
Selhurst Dpt Tennison Roadpass04:19½ No report
Selhurst Dpt Selhurst ExitARR04:2504:37 No report
Selhurst104:3804:44 04:24 04:33 -11 min
Windmill Bridge Junctionpass04:46 04:34 -12 min
East Croydon6pass04:47 04:35 -12 min
South Croydon5pass04:49 04:37 -12 min
Purley504:53 04:41 -12 min

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.

Rolling-stock information is the latest allocation reported by Network Rail. Allocations can change, and updates may be delayed during disruption.