Service timetable

11:50 Basingstoke to London Waterloo 5Q76

Tuesday 24 November 2026South Western Railway

Service details

Power type
Electric multiple unit
Maximum speed
100 mph
Operation
Driver-only operation; Runs as required
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Basingstoke311:50
Woking212:08½12:09½
London Waterloo612:39

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.