Detailed timetable

11:50 Basingstoke to London Waterloo 5Q76

Tuesday 24 November 2026South Western Railway

Service details

Power type
Electric multiple unit
Maximum speed
100 mph
Operation
Driver-only operation; Runs as required
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Basingstoke311:50
Farnborough (Main)pass12:01
Woking Junctionpass12:07½
Woking212:08½12:09½
Hampton Court Junctionpass12:18½
Surbiton2pass12:19½
Berrylands Junctonpass12:20½
New Maldenpass12:23
Wimbledon6pass12:25½
Clapham Junction8pass12:31
Waterloo West Crossingspass12:36
London Waterloo612:39

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.