Service timetable

07:02 Bedford Jowett Sidings to Bedford 5R07

Wednesday 25 November 2026Thameslink

Cancelled This service has been reported as cancelled.

Service details

Power type
Electric multiple unit
Timing load / planned train type
700
Maximum speed
100 mph
Operation
Driver-only operation
LocationPlatformScheduledActual
ArrivalDepartureArrivalDepartureDelay
Bedford Jowett Sidings07:02
Bedford St Johns G.l.07:0507:15
Bedford107:18

Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.