- Power type
- Electric multiple unit
- Timing load / planned train type
- 700
- Maximum speed
- 100 mph
- Operation
- Driver-only operation
Detailed timetable
07:02 Bedford Jowett Sidings to Bedford 5R07
Wednesday 25 November 2026Thameslink
Cancelled This service has been reported as cancelled.
Service details
| Location | Platform | Scheduled | Actual | |||
|---|---|---|---|---|---|---|
| Arrival | Departure | Arrival | Departure | Delay | ||
| Bedford Jowett Sidings | 07:02 | |||||
| Bedford St Johns G.l. | 07:05 | 07:15 | ||||
| Bedford | 1 | 07:18 | ||||
Bold times are confirmed TRUST movement reports. Italic times are predictions based on the latest confirmed delay.